I wanted to add some stairs to the emergency exit near the back of the bus. It’s just nice having multiple entrances.
This project took a very long time because I am not very good at welding, I needed Kate to be on-site, the weather has been pretty bad for the last couple months, I was busy, and the holidays got in the way. All excuses aside, it was a difficult part of the project and I wanted it to be done correctly, so I took my time.
As you can see, water can still get in the door and pool up on the bottom stair. I’ve got to do a better job of sealing it up. However, the basic structure is there and functional. I feel very good about this modification.