2015
7/7 Bringing Home the Bus
7/15 Ripping Out the Seats
7/19 Seats Out, Clean Up
7/28 Bees!…and removing the Stop Sign
8/11 Removing the Ceiling and Insulation
10/3 Sanding Party Extras
11/8 Backup Camera and Rear Lock Installed Properly
12/20 Welding Stairs
2016
3/28-4/25 Insulation Installation
5/1 More Insulation
5/6-5/20 Even More Insulation
6 & 7 Sub-floor
8-11 Mistakes and Problems
2017
2-4 Some Solar Photos
6 Framing the Interior
6-7 Grey Water Tank
12/3 Kitchen Cabinet Carcass
12/5-12/7 Sink Plumbing
2018
1/6-1/16 Fresh Water Tank
1/26 Fridge
1/29-2/11 Upper Cabinet Framing and Hood Vent
2/25-3/30 Douglas Fir Slab Countertops
4/17-5/6 Fresh Water Lines
6/2-8/4 Ceiling
6/25-7/31 Pocket Door
6/8-7/17 Arm Rests, Secret Compartment, Main Heater
8/5-8/28 Bench Seats
9/9-9/22 Gas Lines
10/2-10/28 Interior Paint, Battery Isolator
11/4-11/30 Wood Stove Install with Granite Hearth
12/5-12/27 Cabinet Doors, Drawers, Spice Rack, Kitchen Faucet